Ed/Rev 
Number 
Clause 
Number 
Description of Revision 
Authorised 
By 
Date 
Ed 1/Rev 10 
(Cont) 
4.14(d) 
New paragraph inserted re indicative meeting 
dates 
 
 
Ed 1/Rev 11 
Various 
References to various NSW Government 
Guidelines updated 
GM, CPS 
11/08/14 
 
3.2(h) 
New sentence inserted at the end of the 
introductory paragraph, to foreshadow that 
RMS may require financial assessments to be 
undertaken of the Contractor, during the 
course of the contract. 
 
 
Ed 1/Rev 12 
Whole 
document 
“Minister for Employment and Workplace 
Relations” changed to “Minister for 
Employment”. “Planning and Infrastructure 
Minister” changed to “Planning Minister” 
GM, CPS 
09/01/15 
 
3.2(f)(ii)9. 
Submission requirements changed for Initial 
Project WHS Management Plan 
 
 
 
4.20(ii) 
“National Privacy Principle 13” changed to 
“Australian Privacy Principle 5” 
 
 
 
Appendix 
3/Table 7 
New table 
 
 
Ed 1/Rev 13 
2.2.3(b) 
New evaluation criterion (Criterion 5) 
inserted in Table 1 
GM,CPS 
29/01/15 
 
2.2.3(c) 
Table 2 - New item (item (vi)) inserted under 
Volume I. Item (vii) under Volume IV 
modified by adding “Apprenticeship Targets” 
 
 
 
3.2(c)(vi) 
New clause (Referees) 
 
 
 
3.2(f)(ii)7. 
Amended to include new requirements re 
apprenticeship targets and monthly reporting 
 
 
Ed 1/Rev 14 
3.2(f)(ii)10 
Modified to reflect requirements of the new 
NSW Government Policy on Aboriginal 
Participation in Construction 
GM,CPS 
31/03/15 
Ed 1/Rev 15 
3.2(c)(vi) 
Referees Level changed where Contractor 
has worked with Government 
GM,CPS 
05/05/15 
Ed 1/Rev 16 
4.11 
Split in two parts, to separate Building Code 
2013 clauses from Australian Government 
WHS Accreditation Scheme 
GM,CPS 
03/06/15 
 
4.11.1(a) 
New paragraph, to emphasise that Building 
Code 2013 only applies to projects fully or 
partially funded by the Commonwealth 
 
 
 
4.11.2(a) 
New paragraph, to emphasise that the 
requirements of the Australian Government 
WHS Accreditation Scheme only applies to 
projects fully or partially funded by the 
Commonwealth  
 
 
IC-DC-C92 
D&C Request for Tender  
Edition 1, Revision 21, September 2017 
Page xii 


Ed/Rev 
Number 
Clause 
Number 
Description of Revision 
Authorised 
By 
Date 
Ed 1/Rev 16 
(Cont) 
4.11.2(d) 
New paragraph - Reference to “Regulation 
24(h) of the Fair Work (Building Industry – 
Accreditation Scheme) Regulations 2005” 
inserted  
 
 
 
Annexure 2 
to Tender 
Form 
Reference to “Regulation 24(h) of the Fair 
Work (Building Industry – Accreditation 
Scheme) Regulations 2005” inserted 
 
 
Ed 1/Rev 17 
2.2.3(c)/ 
Table 2 
New item (item (x)) inserted under Volume 
IV (Initial Chain of Responsibility (CoR) 
Management Plan) 
GM,CPS 
22/09/15 
 
3.2(f)(ii)10 
New item - Initial Chain of Responsibility 
(CoR) Management Plan. Subsequent items 
re-numbered 
 
 
 
4.2(d) 
New line inserted in Table under Volume IV 
- Initial CoR Management Plan 
 
 
 
Appendix 
3/Table 8 
New table 
 
 
Ed 1/Rev 18 
2.2.3/Table 
2/Volume 
(IV)(vii);& 
3.2(f)(ii)7 
Inserted requirements re “Skills and Training 
in the Construction Industry” 
GM, 
Commercial 
20/06/16 
 
2.2.3/Table 
1&2 and 
3.2(c)(vi) 
Deleted requirements re Referees. Evaluation 
to be done at ROI stage only 
 
 
 
2.2.3/Table 
2/Volume 
(IV)(xi) & 
3.2(f)(ii)11 
Inserted requirements re mandatory 
implementation of the NSW Government 
Policy on Aboriginal Participation in 
Construction 
 
 
 
3.2(f)(ii)10 
Word “National” deleted from reference to 
“Heavy Vehicle National Law”, to reflect 
changes made in ROI 
 
 
 
4.10 
Clause renamed to “Compliance with NSW 
Government Policies and Guidelines” and 
split into three sub-clauses; existing clause 
4.10 re-numbered to 4.10.1 
 
 
 
4.10.2 
New clause – NSW Government 
Procurement Guide Skills and Training in the 
Construction Industry 
 
 
 
4.10.3 
New clause – NSW Government Policy on 
Aboriginal Participation in Construction 
 
 
 
4.2(d)(ii)C & 
4.11.1(h)(ii) 
Inserted requirement re FWBC letter of 
compliance 
 
 
 
Appendix 
3/Table 8 
Minor modification to reflect changes made 
in ROI 
 
 
 
Appendix 
3/Table 9 
New Table – Schedule of Skills Development 
and Training 
 
 
IC-DC-C92 
D&C Request for Tender  
Edition 1, Revision 21, September 2017 
Page xiii 


Ed/Rev 
Number 
Clause 
Number 
Description of Revision 
Authorised 
By 
Date 
Ed 1/Rev 19 
2.2.3(c)/ 
Table 2; 
3.2(f)(ii); 
4.2(d); 
4.11.1; 
4.11.2; 4.22; 
Annexures 
2A & 2B to 
Tender Form 
Updated as a result of the enactment of the 
Building and Construction Industry 
(Improving Productivity) Act 2016 (Cth) and 
the Code for the Tendering and Performance 
of Building Work 2016  
 
 
 
GM, 
Commercial 
Services 
11/07/17 
 
4.10.1; 
Annexure 1 
to Tender 
Form 
Minor edits 
 
 
 
4.10.2(c) 
Amended reporting requirements 
 
 
Ed 1/Rev 20 
Annexure 2B 
to Tender 
Form 
Minor change re regulation 26(1)(f) 
requirement 
Director, 
Commercial 
Services 
16/08/17 
Ed 1/Rev 21 
4.11.1(c)(iv), 
4.11.1(e)(i)(a
), and 
Annexure 2A 
6(a)(i), 
6(b)(ii), 8(b) 
and 
Attachment 
A Item A1.3 
Revised to reflect the introduction of the 
Work Health and Safety Regulation 2017, 
replacing the 2011 Regulation 
Director 
Commercial 
Services 
29/09/17 
 
IC-DC-C92 
D&C Request for Tender  
Edition 1, Revision 21, September 2017 
Page xiv 