Ed/Rev
Number
Clause
Number
Description of Revision
Authorised
By
Date
Ed 1/Rev 5
(Cont.)
3.2(c)(ii)
Prequalification categories updated to reflect
the National Prequalification Scheme
3.2(c)(iii)
Words “Experience and Performance of
Tenderer”
added
3.2(c)(iii)B.
Words “of its and its Participants” added
3.2(c)(iv)B
Deleted (Proof Engineer). Subsequent Items
re-numbered
3.2(c)
Item (vii) added (Proof Engineer
requirements)
3.2(d)
Item (iii) “Retaining Wall Structures” added .
Subsequent Items re-numbered.
3.2.(d)(v)
Words “Urban and” deleted
3.2(d)(v)B.
Words “and typical cross sections” added
3.2(d)(v)D.
Sentence “The Tenderer must divide the
Project Works into sections to match the
extents of cost centres [insert number] to
[insert number] inclusive and provide a
completed planting and seeding schedules for
each section” added
3.2.(e)(v)
Item”I” added (Groundwater management
strategy)
3.2(e)(vii)A.
Words “design input parameters” added
3.2(e)(viii)A. Words “and detailed layouts” deleted
3.2(e)(ix)C.
Words “avoiding damage” added
3.2(e)(x)B.
Item 7 “Drainage Construction” added.
Subsequent Items re-numbered.
3.2(f)(ii)D.2.
New dot point added (“identify project
specific opportunities for emission reduction,
resource conservation and other sustainability
initiatives.”)
3.2(g)(vi)A-
D
Clause rewritten to reflect changes in Clauses
2.3 and 2.5
4.2(a)
Sentence “The Tenderer must submit a
Tender which conforms to the Tender
Conditions and the Project Deed” added
4.11(d)
Words “information within the knowledge,
possession or control of RMS, other
government departments or agencies or their
respective officers, employees, consultants,
contractors or agents” added
4.13
Clause re-written – significant changes
related to positive guidance
meetings/workshops
IC-DC-C92
D&C Request for Tender
Edition 1, Revision 21, September 2017
Page iv
Ed/Rev
Number
Clause
Number
Description of Revision
Authorised
By
Date
Ed 1/Rev 5
(Cont.)
Appendix
1/Clause
1d(i)
Deleted words “(and for that purpose, any
information, data or document which is
provided (including verbally or visually) by
RMS at, or following from, any pre-tender or
tender briefing will constitute 'Information
Documents')”
Appendix
1/Clause
1g(iv)B
Words “sections 52 and 53 (respectively) of
the Trade Practices Act 1974” replaced with
“in the Competition and Consumer Act 2010
(Cth)”
Ed1/Rev 6
3.2(c)(ii)F
Steel fabrication prequalification category
updated to “S”
GM, IC
12.08.11
3.2(g)(vi)A.1 Deleted words “Contractor’s hourly rates for
variations”
3.2(g)(vi)C.1
Added requirements related to positions
listed in the “Contractor’s Hourly Rates”
table (included in Schedule 2)
Ed 1/Rev 7
Various
“RTA” replaced with “RMS”; “Roads and
Traffic Authority of New South Wales”
Replaced with “Roads and Maritime
Services”; RTA’s ABN number replaced
with RMS ABN number. “Probity Auditor”
replaced with “Probity Adviser”.
GM, IC
11.07.12
1.6
Paragraph (b) added
1.7
Added words “including for the purposes of
clause 1.8 below”.
1.10 and 1.11 New clauses
2
Clause re-written.
Previous clauses 2.2, 2.3 and 2.4 combined
into one clause (now clause 2.2).
Evaluation of Project Verifier changed so
that the outcome of the PV’s non-price
evaluation forms part of the Tender
evaluation process. New Table 3 inserted
(Evaluation Criteria for PV); subsequent
tables re-numbered.
PV’s and ER’s fees are no longer considered
in Tenderer’s comparative price evaluation.
Tender evaluation criteria modified (previous
criteria 2 and 4 combined into one criterion).
Added clause to evaluate DAB Members
(now clause 2.4)
3.2(a)
New Volume VII added (PV, ER and DAB
Nominees). Subsequent Volumes re-
numbered
IC-DC-C92
D&C Request for Tender
Edition 1, Revision 21, September 2017
Page v
Ed/Rev
Number
Clause
Number
Description of Revision
Authorised
By
Date
Ed 1/Rev 7
(Cont)
3.2(c)(ii)G
Deleted words related to RMS objective to
maintain competitive industry and to spread
benefits of the project
3.2(c)(iii)B
Added words “of the Tenderer and its
Participants including their personnel” after
words “and performance”
3.2(c)(iv)
Words “in the following subcontractors”
replaced with “of the following
Subcontractors including their personnel” in
the first paragraph
3.2(c)(v) &
3.2(c)(vi)
Moved to new clause 3.2(i). Subsequent
clauses re-numbered
3.2(c)(v)A
Added words “and require the Tenderer to
nominate an alternative Proof Engineer and
provide the information required above in
this clause”
3.2(d)(vii)
New (introductory) paragraph inserted
3.2(e)(iii)A
Added words “and the strategy to allow for
future carriageway widening”
3.2(e)(x)
New paragraph inserted (last paragraph)
3.2(f)
Requirements related to Project Verifier
moved to new clause 3.2(i) and to Schedule
12 of the Project Deed. New paragraph
inserted under Item 10 (Industrial Relations
Strategy).
3.2(g)(vi)A
Re-written – PV’s and ER’s fees to be
excluded from the Design and Construction
Payment Schedules. Requirements re PV’s
and ER’s Payment Schedules moved to new
Clause 3.2(i)
3.2(h)(iii)C.3 Added words “proposed to be used in
performing the Contractor's Work” after
words “of construction equipment”
3.2(i)
New clause (PV, ER and DAB Nominees);
subsequent clauses re-numbered
3.2(j)
Inserted new clauses (iii) and (iv);
subsequent clauses re-numbered
4.11(c)(ii)
Added words “whether it is contained or
stated in the Information Documents or
made, drawn or undertaken by the Tenderer”
4.13(i)(v)
Added words “including identifying any
issues which they consider commercial-in-
confidence and advising names and
companies of attendees”
4.21
Added definitions of “DAB”, “DAB
Agreement”, “Principal”, “RMS” and “RTA”
IC-DC-C92
D&C Request for Tender
Edition 1, Revision 21, September 2017
Page vi
Dostları ilə paylaş: |