Ed/Rev 
Number 
Clause 
Number 
Description of Revision 
Authorised 
By 
Date 
Ed 1/Rev 7 
(Cont) 
4.21 
Words “or where the Tenderer is constituted 
by a single legal entity, means the Tenderer” 
added to definition of “Participant” 
 
 
 
4.21 
Words “and includes the conditions in the 
Pre-tender Conditions in relation to the 
period prior to the issue of this Request for 
Tender” added to definition of “Tender 
Conditions” 
 
 
 
Appendix 2 
Tender Form modified to reflect the 
requirement to exclude PV’s and ER’s Fees 
from the Design and Construction Payment 
Schedules. 
 
 
 
Appendix 2 
Annexure to Tender Form/ Declaration of 
Compliance – reference to latest revision of 
the Australian Government Implementation 
Guidelines included (May 2012) 
 
 
Ed 1/Rev 8 
1.10(d) 
Split in two items; item (ii) added 
GM, IC 
12.12.12 
 
2.2.2(a)(ii) 
Words “delay rates” deleted 
 
 
 
2.2.2(b)(ii) 
Clause changed to exclude construction 
period from the Present Value evaluation 
 
 
 
2.2.2(c) 
Clause deleted 
 
 
 
2.2.3(c)/ 
Table 2 
Volume IV/Delivery Strategy – item (viii) 
deleted (i.e. “Initial Traffic Management and 
Safety Plan”) 
Volume V/Project Costs – words “and Delay 
Rates” deleted from item (iii). Item (iv) 
deleted (i.e. “Whole-of-Life costs”) 
 
 
 
3.2(a) 
Words “unless otherwise stated in clauses 
3.2(c) to 3.2(j) of this Request for Tender” 
added to the second last paragraph. 
New paragraph inserted to describe “To be 
submitted on request” part of Tender 
submission. 
 
 
 
3.2(c)(i), 
3.2(c)(ii), 
3.2(c)(iii)B 
& 3.2(c)(iv)  
Note for Tenderers included to emphasise 
requirement to provide only the details that 
are different from the details provided by 
Tenderers in the ROI 
 
 
 
3.2(c)(ii)G&

Words “[Tenderer is to acknowledge and 
agree in its Tender]” inserted 
 
 
 
3.2(c)(iv) 
“Seed Collection Subcontractor” and Testing 
Entity” subcontractor deleted. 
 
 
 
3.2(d)(ii)A 
Words “each bridge” changed to “each 
different bridge type”  
 
 
 
3.2(d)(ii)B 
Words “each bridge” changed to “each 
bridge type” 
 
 
 
3.2(d)(ii)C 
New clause 
 
 
IC-DC-C92 
D&C Request for Tender  
Edition 1, Revision 21, September 2017 
Page vii 


Ed/Rev 
Number 
Clause 
Number 
Description of Revision 
Authorised 
By 
Date 
Ed 1/Rev 8 
(Cont) 
3.2(d)(iv) 
Clauses “B” & “C” deleted; subsequent 
clause re-numbered. Words “design of the” 
inserted in front of “application” in ex-clause 
“D” (now clause “B”) 
 
 
 
3.2(d)(v)A 
Words “Colour plan showing” replaced with 
“Information defining”; words “at 1:4000” 
deleted 
 
 
 
3.2(d)(v)E & 

Clauses deleted; subsequent clause re-
numbered 
 
 
 
3.2(d)(v)E 
(ex G) 
Content deleted and replaced with 
“Landscape management requirements for 
rest areas and feature planting (if included)” 
 
 
 
3.2(d)(vi)A 
Modified to specify it only for a non-standard 
or feature lighting 
 
 
 
3.2(d)(vi)B 
New clause 
 
 
 
3.2(d)(vii)A 
Words “1:4000 plan showing” replaced with 
“Information defining locations and extents 
of”; word “treatments” deleted 
 
 
 
3.2(d)(vii)C 
Words “noise mounds and headlight screens”     
replaced with “from road user viewpoint” 
 
 
 
3.2(e)(i)A 
Words “(Plan scale 1:2000)” added 
 
 
 
3.2(e)(i)B 
Clause deleted; subsequent clauses re-
numbered 
 
 
 
3.2(e)(i)C 
“spacing of 20m” changed to “spacing of 
25m”; words (natural scale 1:500) added 
 
 
 
3.2(e)(i)J 
Clause deleted  
 
 
 
3.2(e)(ii)A 
Words “transverse and longitudinal drainage” 
and “catch drains” inserted 
 
 
 
3.2(e)(ii)B 
Clause changed to specify submission of 
maintenance diaries only for 
unusual/uncommon drainage system 
components 
 
 
 
3.2(e)(iii)B 
Clause deleted 
 
 
 
3.2(e)(iv)B 
& E 
Clause deleted; subsequent clauses re-
numbered 
 
 
 
3.2(e)(iv)E 
Clause changed to specify submission of 
maintenance diaries only “for pavements 
across expansive subgrades, mines 
subsidence, soft soils and floodplains” 
 
 
 
3.2(e)(v)H 
Clause deleted and replaced with three new 
clauses, numbered as H, I & J 
 
 
 
3.2(e)(v)K 
(ex I) 
Words “if required or likely to be required by 
the project EIS” added 
 
 
 
3.2(e)(vii)E 
Clause deleted; subsequent clauses re-
numbered 
 
 
IC-DC-C92 
D&C Request for Tender  
Edition 1, Revision 21, September 2017 
Page viii 


Yüklə 0,81 Mb.

Dostları ilə paylaş:
1   2   3   4   5   6   7   8   9   ...   41




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©www.genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə