Ed/Rev
Number
Clause
Number
Description of Revision
Authorised
By
Date
Ed 1/Rev 7
(Cont)
4.21
Words “or where the
Tenderer is constituted
by a single legal entity, means the Tenderer”
added to definition of “Participant”
4.21
Words “and includes the conditions in the
Pre-tender Conditions in relation to the
period prior to the issue of this Request for
Tender” added to definition of “Tender
Conditions”
Appendix 2
Tender Form modified to
reflect the
requirement to exclude PV’s and ER’s Fees
from the Design and Construction Payment
Schedules.
Appendix 2
Annexure to Tender Form/ Declaration of
Compliance – reference to latest revision of
the Australian Government Implementation
Guidelines included (May 2012)
Ed 1/Rev 8
1.10(d)
Split in two items; item (ii) added
GM, IC
12.12.12
2.2.2(a)(ii)
Words “delay rates” deleted
2.2.2(b)(ii)
Clause changed
to exclude construction
period from the Present Value evaluation
2.2.2(c)
Clause deleted
2.2.3(c)/
Table 2
Volume IV/Delivery Strategy – item (viii)
deleted (i.e. “Initial Traffic Management and
Safety Plan”)
Volume V/Project Costs – words “and Delay
Rates” deleted from item (iii). Item (iv)
deleted (i.e. “Whole-of-Life costs”)
3.2(a)
Words “unless otherwise stated in clauses
3.2(c) to 3.2(j) of this Request for Tender”
added to the second last paragraph.
New paragraph inserted to describe “To be
submitted on request” part of Tender
submission.
3.2(c)(i),
3.2(c)(ii),
3.2(c)(iii)B
& 3.2(c)(iv)
Note for Tenderers included to emphasise
requirement to provide only
the details that
are different from the details provided by
Tenderers in the ROI
3.2(c)(ii)G&
H
Words “[
Tenderer is to acknowledge and
agree in its Tender]” inserted
3.2(c)(iv)
“Seed Collection Subcontractor”
and Testing
Entity” subcontractor deleted.
3.2(d)(ii)A
Words “each bridge” changed to “each
different bridge type”
3.2(d)(ii)B
Words “each bridge” changed to “each
bridge type”
3.2(d)(ii)C
New clause
IC-DC-C92
D&C Request for Tender
Edition 1, Revision 21, September 2017
Page vii
Ed/Rev
Number
Clause
Number
Description of Revision
Authorised
By
Date
Ed 1/Rev 8
(Cont)
3.2(d)(iv)
Clauses “B” & “C” deleted; subsequent
clause re-numbered. Words “design of the”
inserted in front of “application” in ex-clause
“D” (now clause “B”)
3.2(d)(v)A
Words “Colour plan showing” replaced with
“Information defining”; words “at 1:4000”
deleted
3.2(d)(v)E &
F
Clauses deleted; subsequent clause re-
numbered
3.2(d)(v)E
(ex G)
Content deleted and replaced with
“Landscape management requirements for
rest areas and feature planting (if included)”
3.2(d)(vi)A
Modified to specify it only for a non-standard
or
feature lighting
3.2(d)(vi)B
New clause
3.2(d)(vii)A
Words “1:4000 plan showing” replaced with
“Information defining locations and extents
of”; word “treatments” deleted
3.2(d)(vii)C
Words “noise mounds and headlight screens”
replaced with “from road user viewpoint”
3.2(e)(i)A
Words “(Plan scale 1:2000)” added
3.2(e)(i)B
Clause deleted; subsequent clauses re-
numbered
3.2(e)(i)C
“spacing of 20m” changed to “spacing of
25m”; words (natural scale 1:500) added
3.2(e)(i)J
Clause deleted
3.2(e)(ii)A
Words “transverse and longitudinal drainage”
and “catch drains” inserted
3.2(e)(ii)B
Clause changed
to specify submission of
maintenance diaries only for
unusual/uncommon drainage system
components
3.2(e)(iii)B
Clause deleted
3.2(e)(iv)B
& E
Clause deleted; subsequent clauses re-
numbered
3.2(e)(iv)E
Clause changed to specify submission of
maintenance diaries only “for pavements
across expansive subgrades, mines
subsidence, soft soils and floodplains”
3.2(e)(v)H
Clause deleted and replaced with three new
clauses, numbered as H, I & J
3.2(e)(v)K
(ex I)
Words “if required
or likely to be required by
the project EIS” added
3.2(e)(vii)E
Clause deleted; subsequent clauses re-
numbered
IC-DC-C92
D&C Request for Tender
Edition 1, Revision 21, September 2017