Ed/Rev
Number
Clause
Number
Description of Revision
Authorised
By
Date
Ed 1/Rev 8
(Cont)
3.2(e)(viii)A
Words “including design of all temporary
roadworks and Local Roads” deleted
3.2(e)(x)B
Words referred to in Schedule 3 to the
Project Deed” deleted
3.2(f)
Re-written to simplify requirements related
to the Initial Management Plans
3.2(g)(vi)C
Words “and Delay Rates” deleted
3.2(g)(vi)C.1
& 2
Clauses deleted
3.2(g)(vi)D
Clause deleted
3.2(h)
Introductory section re-written to match
relevant content given in ROI. Financial
details are to be submitted on request
3.2(h)(iii)B
Subclauses (1) and (2) deleted (cash inflow
and outflow from current and anticipated
projects)
3.2(i)(i)C
Second paragraph slightly modified to make
it clear that the Initial PV Management Plan
needs to address the methodology to be
applied to achieve minimum requirements in
Schedule 12F to the Project Deed, as opposed
to addressing requirements of Schedule 12F
in the Initial PV Plan.
3.2(i)(i)D &
E
Reference added to items in table in clause
1.1 of the Tender Form
3.2(i)(ii)A
Four dot points added, to specify
requirements for ER
3.2(i)(ii)
Clause (B) deleted; subsequent clauses re-
numbered
3.2(i)(ii)C &
D
Reference added to items in table in clause
1.1 of the Tender Form
3.2(i)(ii)E
New clause
3.2(i)(iii)D
Sub-clauses 1 and 2 added to further clarify
submission details for DAB nominees’ fees
3.2
“Schedule 1 to Clause 3: Environmental
Management Issues” and “Schedule 2 to
Clause 3: Design Management
Requirements“ inserted at the end of Clause
3.2
4.2(d)
Submission requirements changed – now
only one hard copy and one electronic copy
(pdf format)
Appendix 2
Items included in table in clause 1.1 of the
Tender Form, for DAB nominees fees
IC-DC-C92
D&C Request for Tender
Edition 1, Revision 21, September 2017
Page ix
Ed/Rev
Number
Clause
Number
Description of Revision
Authorised
By
Date
Ed 1/Rev 9
1.4
Clause re-formatted (split into four sub-
clauses). Details re RMS Flood and Noise
Data added.
GM, IC
24.07.13
1.6(b)
New clause
1.10(c)
Words “having regard to the criteria in
Schedule 39 to the Project Deed. The
nomination of the third member is subject to
the approval by RMS and the Contractor”
included at the end of the clause
2.2.3(c)/
Table 2
Volume IV/Delivery Strategy – “Initial
Project Training Management Plan” replaced
with “Enterprise Training Management
Plan”. ‘Initial Project WHS Management
Plan” deleted. WHS Management” included
as a new Item, to be provided only (i.e. not to
be evaluated under tender evaluation criteria)
3.2(f)(ii)
Re-written, to simplify submission
requirements
3.2(f)(iii)
New clause
3.2(g)(iv)
New clause
3.2(h)(i)
Content deleted and replaced with new
financial requirements
3.2(i)(iii)D
Existing content of sub-clauses 1 and 2
deleted and replaced with new content, to
reflect changes made in Appendix 3 to
Schedule 38.
4.7(d)(xiii)
Words “National Code and Implementation
Guidelines” deleted and replaced with
“Building Code”
4.10
Content deleted and replaced with new
requirements related to NSW Government
Code of Practice for Procurement and
Implementation Guidelines
4.11
New clause - new requirements related to
Building Code 2013. Subsequent clauses re-
numbered and cross-referencing corrected
4.12
Title changed from “Geotechnical Data” to
“RMS Data”. Clause split in two sub-clauses.
Cross-referencing corrected
4.22(a)(xxii)
A.7
New Item (i.e. Appendix 3); subsequent
Items re-numbered
Appendix 1
Deed of Disclaimer modified to reflect
changes re RMS Data. Schedule B re-named
to RMS Geotechnical Data; new set of data
included in Schedule B (i.e. “Window
Data”). Schedules C (RMS Flood Data) and
D (RMS Noise Data) added
IC-DC-C92
D&C Request for Tender
Edition 1, Revision 21, September 2017
Page x
Ed/Rev
Number
Clause
Number
Description of Revision
Authorised
By
Date
Ed 1/Rev 9
(Cont.)
Appendix 2
Table in Clause 1.1 of the Tender Form
modified to reflect the changes made in
Appendix 3 to Schedule 38 (re DAB)
Appendix 2
Annexure to Tender Form/ Declaration of
Compliance – Content deleted and replaced
with new requirements related to Building
Code 2013. Also, Annexure was numbered as
Annexure 2
Appendix 2
New Annexure added to the Tender Form as
Annexure 1 – Schedule of Compliance with
NSW Code and NSW Guidelines
Appendix 3
New Appendix – Information for Initial
Project Plans
Ed 1/Rev 10
2.2.2(a)(iii)
Reference to “RMS Economic Analysis
Manual” replaced with “Principles and
Guidelines for Economic Appraisal of
Transport Investment and Initiatives”.
“present value (PV)” changed to “net present
value (NPV)”
GM, IC
15.04.14
2.2.3(c)/
Table 2
Volume IV/Delivery Strategy – “Industrial
Relations Strategy” replaced with “Initial
Workplace Relations Management Plan”.
“WHS Management” replaced with “Initial
Project WHS Management Plan “ (to be
evaluated under tender Criterion 1)
3.2(a)
New paragraph inserted at the end of clause
(a).
3.2(e)(i)
Introductory paragraph - concept geometric
design is no longer required as hard copy file
3.2(f)(ii)8
“Industrial Relations Strategy” replaced with
“Initial Workplace Relations Management
Plan”. Submission requirements specified
3.2(f)(ii)9
“WHS Management” replaced with “Initial
Project WHS Management Plan“.
Submission requirements specified
3.2(g)(vii)A.
3
New paragraph
3.2(j)(viii)
New paragraph
4.2(d)
Tender submission requirements changed
4.2(e)
New clause; subsequent clauses renumbered
4.10(d)
Requirements related to Workplace Relations
Management Plan and WHS Management
Plan deleted (now included in 3.2(f)(ii))
4.12
Clause re-written to remove separation of
geotechnical and flood/noise data into sub-
clauses
IC-DC-C92
D&C Request for Tender
Edition 1, Revision 21, September 2017
Page xi
Dostları ilə paylaş: |