Ed/Rev 
Number 
Clause 
Number 
Description of Revision 
Authorised 
By 
Date 
Ed 1/Rev 8 
(Cont) 
3.2(e)(viii)A 
Words “including design of all temporary 
roadworks and Local Roads” deleted 
 
 
 
3.2(e)(x)B 
Words referred to in Schedule 3 to the 
Project Deed” deleted 
 
 
 
3.2(f) 
Re-written to simplify requirements related 
to the Initial Management Plans 
 
 
 
3.2(g)(vi)C 
Words “and Delay Rates” deleted 
 
 
 
3.2(g)(vi)C.1 
& 2 
Clauses deleted 
 
 
 
3.2(g)(vi)D 
Clause deleted 
 
 
 
3.2(h) 
Introductory section re-written to match 
relevant content given in ROI. Financial 
details are to be submitted on request 
 
 
 
3.2(h)(iii)B 
Subclauses (1) and (2) deleted (cash inflow 
and outflow from current and anticipated 
projects) 
 
 
 
3.2(i)(i)C 
Second paragraph slightly modified to make 
it clear that the Initial PV Management Plan 
needs to address the methodology to be 
applied to achieve minimum requirements in 
Schedule 12F to the Project Deed, as opposed 
to addressing requirements of Schedule 12F 
in the Initial PV Plan. 
 
 
 
3.2(i)(i)D & 

Reference added to items in table in clause 
1.1 of the Tender Form 
 
 
 
3.2(i)(ii)A 
Four dot points added, to specify 
requirements for ER 
 
 
 
3.2(i)(ii) 
Clause (B) deleted; subsequent clauses re-
numbered 
 
 
 
3.2(i)(ii)C & 

Reference added to items in table in clause 
1.1 of the Tender Form 
 
 
 
3.2(i)(ii)E 
New clause 
 
 
 
3.2(i)(iii)D 
Sub-clauses 1 and 2 added to further clarify 
submission details for DAB nominees’ fees  
 
 
 
3.2 
“Schedule 1 to Clause 3: Environmental 
Management Issues” and “Schedule 2 to 
Clause 3: Design Management 
Requirements“ inserted at the end of Clause 
3.2  
 
 
 
4.2(d) 
Submission requirements changed – now 
only one hard copy and one electronic copy 
(pdf format) 
 
 
 
Appendix 2 
Items included in table in clause 1.1 of the 
Tender Form, for DAB nominees fees 
 
 
IC-DC-C92 
D&C Request for Tender  
Edition 1, Revision 21, September 2017 
Page ix 


Ed/Rev 
Number 
Clause 
Number 
Description of Revision 
Authorised 
By 
Date 
Ed 1/Rev 9 
1.4 
Clause re-formatted (split into four sub-
clauses). Details re RMS Flood and Noise 
Data added. 
GM, IC 
24.07.13 
 
1.6(b) 
New clause 
 
 
 
1.10(c) 
Words “having regard to the criteria in 
Schedule 39 to the Project Deed.  The 
nomination of the third member is subject to 
the approval by RMS and the Contractor” 
included at the end of the clause 
 
 
 
2.2.3(c)/ 
Table 2 
Volume IV/Delivery Strategy – “Initial 
Project Training Management Plan” replaced 
with “Enterprise Training Management 
Plan”. ‘Initial Project WHS Management 
Plan” deleted. WHS Management” included 
as a new Item, to be provided only (i.e. not to 
be evaluated under tender evaluation criteria)  
 
 
 
3.2(f)(ii) 
Re-written, to simplify submission 
requirements 
 
 
 
3.2(f)(iii) 
New clause 
 
 
 
3.2(g)(iv) 
New clause 
 
 
 
3.2(h)(i) 
Content deleted and replaced with new 
financial requirements 
 
 
 
3.2(i)(iii)D 
Existing content of sub-clauses 1 and 2 
deleted and replaced with new content, to 
reflect changes made in Appendix 3 to 
Schedule 38. 
 
 
 
4.7(d)(xiii) 
Words “National Code and Implementation 
Guidelines” deleted and replaced with 
“Building Code” 
 
 
 
4.10 
Content deleted and replaced with new 
requirements related to NSW Government 
Code of Practice for Procurement and 
Implementation Guidelines 
 
 
 
4.11 
New clause - new requirements related to 
Building Code 2013. Subsequent clauses re-
numbered and cross-referencing corrected 
 
 
 
4.12 
Title changed from “Geotechnical Data” to 
“RMS Data”. Clause split in two sub-clauses. 
Cross-referencing corrected 
 
 
 
4.22(a)(xxii)
A.7 
New Item (i.e. Appendix 3); subsequent 
Items re-numbered 
 
 
 
Appendix 1 
Deed of Disclaimer modified to reflect 
changes re RMS Data. Schedule B re-named 
to RMS Geotechnical Data; new set of data 
included in Schedule B (i.e. “Window 
Data”). Schedules C (RMS Flood Data) and 
D (RMS Noise Data) added 
 
 
IC-DC-C92 
D&C Request for Tender  
Edition 1, Revision 21, September 2017 
Page x 


Ed/Rev 
Number 
Clause 
Number 
Description of Revision 
Authorised 
By 
Date 
Ed 1/Rev 9 
(Cont.) 
Appendix 2 
Table in Clause 1.1 of the Tender Form 
modified to reflect the changes made in 
Appendix 3 to Schedule 38 (re DAB) 
 
 
 
Appendix 2 
Annexure to Tender Form/ Declaration of 
Compliance – Content deleted and replaced 
with new requirements related to Building 
Code 2013. Also, Annexure was numbered as 
Annexure 2 
 
 
 
Appendix 2 
New Annexure added to the Tender Form as 
Annexure 1 – Schedule of Compliance with 
NSW Code and NSW Guidelines 
 
 
 
Appendix 3 
New Appendix – Information for Initial 
Project Plans 
 
 
Ed 1/Rev 10 
2.2.2(a)(iii) 
Reference to “RMS Economic Analysis 
Manual” replaced with “Principles and 
Guidelines for Economic Appraisal of 
Transport Investment and Initiatives”. 
“present value (PV)” changed to “net present 
value (NPV)” 
GM, IC 
15.04.14 
 
2.2.3(c)/ 
Table 2 
Volume IV/Delivery Strategy – “Industrial 
Relations Strategy” replaced with “Initial 
Workplace Relations Management Plan”. 
“WHS Management” replaced with “Initial 
Project WHS Management Plan “ (to be 
evaluated under tender Criterion 1)  
 
 
 
3.2(a) 
New paragraph inserted at the end of clause 
(a). 
 
 
 
3.2(e)(i) 
Introductory paragraph - concept geometric 
design is no longer required as hard copy file 
 
 
 
3.2(f)(ii)8 
“Industrial Relations Strategy” replaced with 
“Initial Workplace Relations Management 
Plan”. Submission requirements specified 
 
 
 
3.2(f)(ii)9 
“WHS Management” replaced with “Initial 
Project WHS Management Plan“. 
Submission requirements specified 
 
 
 
3.2(g)(vii)A.

New paragraph 
 
 
 
3.2(j)(viii) 
New paragraph 
 
 
 
4.2(d) 
Tender submission requirements changed 
 
 
 
4.2(e) 
New clause; subsequent clauses renumbered 
 
 
 
4.10(d) 
Requirements related to Workplace Relations 
Management Plan and WHS Management 
Plan deleted (now included in 3.2(f)(ii)) 
 
 
 
4.12 
Clause re-written to remove separation of 
geotechnical and flood/noise data into sub-
clauses  
 
 
IC-DC-C92 
D&C Request for Tender  
Edition 1, Revision 21, September 2017 
Page xi 


Yüklə 0,81 Mb.

Dostları ilə paylaş:
1   2   3   4   5   6   7   8   9   ...   41




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©www.genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə