ROADS AND MARITIME SERVICES (RMS)
CONTRACT DOCUMENT C92
REQUEST FOR TENDER
REVISION REGISTER
Ed/Rev
Number
Clause
Number
Description of Revision
Authorised
By
Date
Ed 1/Rev 0
First issue
GM, IC
12.03.10
Ed 1/Rev 1
1.7
Contractor Performance Reporting added.
GM, IC
15.06.10
1.8
Sharing of Information Between Government
Agencies added.
1.9
RMS Statement of Business Ethics added.
2.4(c)
Vol I Experience and performance deleted.
2.4(c)
Vol III item (xi) and Vol IV item (xii) added.
2.4(c)
Vol V Statement of imported content deleted.
2.5
Evaluation of Project Verifiers clarified.
3.2(a)
Executive summary deleted.
4.10
National Code requirements added.
4.13(g)(iv)
Time for submissions reduced from 10 days
to 5 Business Days.
4.14(c), (d)
and (e)
Provision for GIPA Act added.
Appendix 2
Declaration of Compliance with National
Code added.
Ed 1/Rev 2
4.2(h)
Paragraph (h) deleted. Subsequent
paragraphs renumbered
GM, IC
01.09.10
Ed 1/Rev 3
Whole
document
Cross-referencing corrected
GM, IC
15.09.10
3.2(c)(ii)C
“B5” changed to “B10”
3.2(c)(ii)F.2.
Deleted “substantially”
3.2(c)(ii)G.
Deleted “…and subject to the outcomes of
the
meetings on the Project Deed
contemplated by clause 4.13(d) of this
Request for Tender”
3.2(c)(ii)
Item H deleted (as it was a repetition of Item
3.2(c)(i)C.)
3.2(c)(ii)
New Item F. inserted (steel fabrication
prequalification requirements). Subsequent
Items re-numbered
3.2(f)(ii)D
Item 13 deleted
IC-DC-C92
D&C
Request for Tender
Edition 1, Revision 21, September 2017
Page i
Ed/Rev
Number
Clause
Number
Description of Revision
Authorised
By
Date
Ed 1/Rev 3
(cont’d)
4.2(b)(ii)
Deleted “Subject to the
outcomes of the
meetings on the Project Deed contemplated
by clause 4.13(d) of this Request for Tender”
4.13(d), 1
st
Sentence
Added words “any other” in front of word
“issues”. Word “Deed” deleted.
4.21(a)(xviii)
A.(10)
Deleted “Draft Interface Deed”. Added
“
[insert project specific documents]”
4.21(a)(xix)
Definition of Tenderer corrected
Ed 1/Rev 4
2.3(a)
Clause re-written to remove NPV adjustment
related to the Project Contract Sum and the
conformance adjustments.
Paragraphs (ii) and (iii) combined; paragraph
(iv) (ie “RMS overhead costs”) deleted.
Subsequent paragraphs re-numbered.
GM, IC
24.11.10
2.4(c) Table
2
Tender Details
Required for Volume II
changed from “Aesthetics” to “Urban
Design”.
2.5(a)
Sub-clause (a) broken down into two sub-
clauses ie (a) and (b). Subsequent sub-clauses
re-numbered.
Added words “When preparing the Project
Verifiers’ submissions, the Tenderer needs to
include a project specific content. Inclusion
of a generic stuff should be limited.” to the
new sub-clause (a).
Deleted words “The evaluation of the two
entities nominated in each Tender will be
carried out independently to
the evaluation of
the balance of each Tender” from the new
sub-clause (b).
2.5(c)
Added words “The scores allocated to the
chosen Project Verifier entity will be used
when scoring the Tenderer’s Tender.” to the
new sub-clause (c)
3.2(a)
Volume II changed from “Aesthetics” to
“Urban Design”.
3.2(c)(iv)
Added paragraph “The Tenderer is required
to provide to RMS the Proof Engineer’s
details within
[insert number] weeks of being
issued
with RFT documentation, so that the
RMS can provide early comment if it is not
satisfied with the proposed Proof Engineer.
RMS reserves the right to reject the Proof
Engineer’s nomination.”
3.2(d)
Volume II changed from “Aesthetics” to
“Urban Design”.
3.2(e)(x)B.
Deleted words “within each cost centre”
IC-DC-C92
D&C Request for Tender
Edition 1, Revision 21, September 2017
Page ii
Ed/Rev
Number
Clause
Number
Description of Revision
Authorised
By
Date
Ed 1/Rev 5
All
Word “assessment”
replaced with word
“evaluation”
GM, IC
20.07.11
2.2(b)
Reference to clause 2.5 added
2.3(a)
Clause re-written - PV adjustment is now
only applicable to the whole-of-life costs.
Labour and plant Variations rates are no
longer requested in Schedule 3
2.3(c)
Clause deleted; subsequent clauses re-
numbered
2.4 Table 1
Words
“methodology for the delivery”
and
“manage”
added
to
Criterion 1
2.4 Table 1
Word “
resources”
added
to Criterion 5
2.4 Table 2
Words “Experience and Performance of
Tenderer”
added
to Volume I/Item (iii)
2.4 Table 2
Words “
Criteria (i) & (iii) to (vi) in clause
2.5(b)”
added
to Volume I/Item (v)
2.4 Table 2
Item “(vii) Proof Engineer” added to
Volume I
2.4 Table 2
Item “(iii) Retaining wall structures”
added
to Volume II
2.4 Table 2
Words “
Landform and Slope
Stabilisation” added to Volume II/Item
(iv)
2.4 Table 2
Item (v)/Volume II changed from “Urban
and landscape design” to “Landscape
design”
2.4 Table 2
Words “
during the Contractor’s Work”
added to Volume III/Item (viii)
2.4 Table 2
Words “
Criterion (ii) in clause 2.5(b)”
added to Volume IV/Item (ii)D.11
2.5(a)
Clause (a) re-drafted
2.5(c)
Words in Clause (c) deleted and replaced
with “The selection of the Project Verifier
does not form part of the Tender selection
process”
2.5(d)
Sentence “The chosen Project Verifier’s Fee
including the Contractor’s margin and
contingency will be included in the Design
Contract Sum and the Construction Contract
Sum as appropriate.” added
3.1(a)(vi)
Words “any option, including” added to first
sentence
IC-DC-C92
D&C Request for Tender
Edition 1, Revision 21, September 2017
Page iii