SAILESH NAIR & ASSOCIATES 

 

- 23 -   



BOB, ANKALAV BRANCH, DIST. ANAND 

 

1, DEFENCE KARMACHARI HSG. SOC. NR. UNITED COLONY, B/H. NAVRACHANA HIGH SCHOOL, SAMA, 



VADODARA – 390 008  TELE-FAX.  0265 2784382  MOB : 9898072813 / 9427602817

 

 



6.3.1 

Measurement of works 

6.3.2 

Mode of Measurements 



6.4 

PAYMENTS & CERTIFICATIONS 

6.4.1 


Certificate & payment 

6.4.2 


Interim bills 

6.4.3 


Certificate for payment to contractor 

6.4.4 


Certificate of virtual completion of works 

6.4.5 


Lien   on sums payable to the contractor 

6.5 

MOBILIZATION ADVANCES  

6.5.1 


Mobilization advances    6.5.1-6.5.5 

7.0 

PROJECT MANAGEMENT 

7.2.1 


Commencement of work 

7.1 


Program of work 

7.3 


Date of completion 

7.3.5 


Delay & extension of work 

7.5.1 


Work at night 

7.6 


Work at holiday 

8.0 

PERFORMANCE 

8.1 

GENERAL 

8.1.1 


Independent Contractor 

8.1.2 


Assignment or Subletting 

8.1.3 


Obtaining information 

8.1.4 


The setting Out 

8.1.5 


Performance 

8.1.6 


Execution of Work 

 

SITE MANAGEMENT 

8.1.7 


Contractor to provide everything necessary 

8.1.8 


Facilities to other contractors 

8.1.9 


Stores at site 

8.1.10 


Electric power for installation 

8.1.11 


General conditions of supply of materials for executing interior 

flooring work 

8.1.12 

Removal of all offensive matters 



8.1.13 

Unfixed materials 

8.1.14 

Removal of improper work & materials 



8.1.15 

Clearing the site of works  

8.1.16 

Occupation of partially completed works by the 



Bank 

8.1.17 


Preparation for occupation & use on completion 

8.1.18 


Keeping the areas and access roads clean 

8.1.19 


Covering up of works 

8.1.20 


Measurements to be recorded before work is covered -up 

8.1.21 


Site Survey 

8.1.22 


Labour Hutments 

8.2 

STAFF MANAGEMENT 

8.2.1 


Information to be supplied by the contractor 

8.2.2 


Appointment of Engineers 

8.2.3 


Site engineer 

8.2.4 


Contractor’s superintendence & Representation on works 

8.2.5 


Dismissal of workmen 

8.2.6 


Other persons engaged by 

Bank  


SAILESH NAIR & ASSOCIATES 

 

- 24 -   



BOB, ANKALAV BRANCH, DIST. ANAND 

 

1, DEFENCE KARMACHARI HSG. SOC. NR. UNITED COLONY, B/H. NAVRACHANA HIGH SCHOOL, SAMA, 



VADODARA – 390 008  TELE-FAX.  0265 2784382  MOB : 9898072813 / 9427602817

 

 



8.3 

SAFETY MANAGEMENT 

8.3.1 


8.3.3 

Reporting of Accidents to Labour 

Safety Codes 

8.3.4 


Other Safety measures 

8.3.5 


Personal Safety Equipments 

8.3.6 


 Hoisting Machines 

8.4 

RISK MANAGEMENT 

8.4.1 


Work performed at Contractor’s Risk  

8.4.2 


Contractor’s liability & insurance 

9.0 

FAILURE OF PERFORMANCE 

9.1.1 


Damages for non-completion 

9.2.1 


Failure by contractor to comply with Architect’s instruction 

7.4 


Suspension of works 

9.3.1 


Determination of contract 

9.4.1 


Notices 

9.5.1 


Termination of contract by 

Bank 

9.6.1/2 


Termination of contract by contractor 

9.7.1/2 


Foreclosure of contract in full or part 

10.0 

COMPLIANCE 

10.1 

COMPLIANCE TO BANK’S/ LEGAL NORMS 

10.1.1 


Notices 

10.1.2 


Authorities, notices, patents, Rights & Royalties 

10.1.3 


Notice to local bodies 

10.1.4 


Municipal Regulations 

10.1.5 


Wages of labour employed by the contractor 

10.1.6 


Display of Notices 

10.1.7 


Insurance Policies 

10.1.8 


Indebtedness & lien 

10.1.9 


Indian Standards code 

10.1.10 


Treasure Trove 

10.1.11 


Technical Audit 

11.00 

ROLE OF ARCHITECT 

11.2 


To Define Terms & Explain Plans 

11.3.1/2  Matter to be finally determined by the Architect 

11.4.1 

Typographical or Clerical errors 



11.5 

Site visits 

11.6 

Address for service 



11.7 

Taking over 



11.8 

DISPUTES 

11.8.1/2  Settlement of Dispute by Arbitration 

11.8.3 

Arbitration 



11.8.4 

Legal 


11.8.5 

Work to be continued during the pendency of the arbitration 




Yüklə 0,62 Mb.

Dostları ilə paylaş:
1   ...   6   7   8   9   10   11   12   13   ...   42




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©www.genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə