ON YOUR LETTER HEAD

(Nationalised/Schedule Bank)

B. Particulars of Bank Account

Sl.No.

Description

Details

01

Bank Name




02

Branch Name/Branch Code




03

Branch Address (including Pincode)




04

9 Digit MICR No. Of Bank & Branch (as appearing on the cheque)




05

Account Number (as appearing on the cheque)




06

Account Type (Savings/Current etc.)




07

Account Held in whose Name

(as appearing on the cheque book)






08

IFCS code of the Branch (for RTGS)




09

IFCS code of the Branch (for NEFT)




Declaration
I hereby confirm that the particulars given above are correct and complete and also undertake to promptly advise any changes to the above details to HPCL. If the transaction is delayed or not affected for reasons of incomplete or incorrect information or Banking delays, I shall not hold Hindustan Petroleum Corporation Limited and its assigns responsible. I also agree for printing of the bank details on the cheque or DD if the payment is affected by cheque/DD.
Thanking you, _________________________________

Signature

Name of the Authorised Person/Stamp:
_______________________

Banker’s Signature:

(Regarding Validation of Bank Details only)

Name:


Designation

Stamp:


Attachment- 6

Page 1 of 2



Hindustan Petroleum Corporation Ltd

Mundra Dispatch & Pumping Station, Mundra-Delhi Pipeline


REFERENCE NO:

9000033-HB-10135

Special Terms and Conditions
1. General



  • HPCL reserves the right to carry out capability assessment of the bidder including

referral to in-house information.

  • Bid document is non-transferable.

  • Bids received after stipulated due date and time, due to any reasons what-so-ever,

Including postal delays, will not be considered.
2. Sealing & Markings of Bids


  • Bidder to note that prices are to be quoted in the format provided in the price Schedule formats.

  • Price bids submitted in any other format and conditional price bids will liable to be rejected.

  • Price bids received in open condition (not in sealed envelope) or kept in any other Part of the bid will also be liable for rejection.

  • In case bidder is unable to quote for this tender than please return the tender set with regret letter stating reasons for not quoting. Failing that future tender enquiry may not be sent to you.

  • If you are mailing your offer in any envelope other than that supplied by us, Kindly subscribe the envelope with details of Tender no, Tender date & due date.


3. Amendment of Bid Document


  • At any time prior to the bid due date, the Owner may for any reason, whether at its own initiative or in response to a clarification requested by a prospective Bidder, modify the Bid Document.


Signature & Seal of the Bidder

Attachment- 6

Page 2 of 2



Hindustan Petroleum Corporation Ltd

Mundra Dispatch & Pumping Station, Mundra-Delhi Pipeline


REFERENCE NO:

9000033-HB-10135

Special Terms and Conditions
4. Format and Signing of Bid

  • All the pages of the Un-priced/priced bid shall be signed by the authorized signatory.


5. Modification and Withdrawal of Bids


  • No bid shall be modified subsequent to the due date & time or extension, if any, for submission of bids. Bidder(s) to note that Price changes after submission of bid shall not be allowed. In case any bidder gives revised prices/price implication without any reason and at his own, his bid shall be rejected.


6. Comparison of Bids


  • Arithmetical errors will be rectified on the following basis:-

  1. If there is a discrepancy between the unit price and the total price that is obtained by the unit price and the quantity, the unit price shall prevail and total price shall be corrected.

  2. In case rates quoted in figure and words differ, the rates quoted in words shall be taken as final.



Signature & Seal of the Bidder
Attachment 7

Page 1 of 20

Attachment to Enquiry no:9000033 - HB - 10135
GENERAL TERMS & CONDITIONS OF WORKS CONTRACT
1 PRELIMINARY
1.1 This is a Contract for execution of ________________________________________________ work at _______________________________________. (Please fill up the blanks)
1.2 The tenderer for the above mentioned item of work is _______________________________________. (Please give the name and address of the tenderer).
1.3 The terms and conditions mentioned hereunder are the terms and conditions of the Contract for the execution of the work mentioned under item 1.1 above.
1.4 It is the clear understanding between Hindustan Petroleum Corporation Limited and the tenderer ______________________________________ (name and address of the tenderer) that in case the tender of ______________________________________________________________ (name and address of the tenderer) is accepted by Hindustan Petroleum Corporation Limited and an intimation to that effect is so issued and also a Purchase Order is placed with ______________________________________________ (name and address of the tenderer) this document will be termed as a Contract between the parties and terms and conditions hereunder would govern the parties interest.
1.5 Interpretation of Contract Documents: All documents forming part of the Contract are to be taken mutually explanatory. Should there be any discrepancy, inconsistency, error or omission in the contract, the decision of the Owner/Engineer-in-Charge/Site-in-Charge shall be the final and the contractor shall abide by the decision. The decision shall not be arbitrable. Works shown upon the drawings but not mentioned in the specification or described in the specifications without being shown on the drawings shall nevertheless be deemed to be included in the same manner as if they are shown in the drawings and described in the specifications.
1.6 Special conditions of Contract: The special conditions of contract, if any provided and whenever and wherever referred to shall be read in conjunction with General Terms and Conditions of contract, specifications, drawings, and any other documents forming part of this contract wherever the context so requires. Notwithstanding the subdivision of the documents into separate sections, parts volumes, every section, part or volume shall be deemed to be supplementary or complementary to each other and shall be read in whole. In case of any misunderstanding arising the same shall be referred to decision of the Owner/ Engineer-in-Charge/Site-in-Charge and their decision shall be final and binding and the decision shall not be arbitrable.
It is the clear understanding that wherever it is mentioned that the Contractor shall do/perform a work and/ or provide facilities for the performance of the work, the doing or the performance or the providing of the facilities is at the cost and expenses of the work not liable to be paid or reimbursed by the Owner.
2. DEFINITIONS
In this contract unless otherwise specifically provided or defined and unless a contrary intention appears from the contract the following words and expressions are used in the following meanings;
2.1 The term "Agreement" wherever appearing in this document shall be read as "Contract".
2.2 The "Authority" for the purpose of this Contract shall be the Chairman and Managing Director or any other person so appointed or authorised.
2.3 The "Chairman and Managing Director" shall mean the Chairman and Managing Director of HINDUSTAN PETROLEUM CORPORATION LIMITED or any person so appointed, nominated or designated and holding the office of Chairman & Managing Director.
2.4 The "Change Order" means an order given in writing by the Engineer-in-Charge or by Owner to effect additions to or deletion from or alterations into the Work.
2.5 The "Construction Equipment" means all appliances and equipment of whatsoever nature for the use in or for the execution, completion, operation or maintenance of the work except those intended to form part of the Permanent Work.
2.6 The "Contract" between the Owner and the Contractor shall mean and include all documents like enquiry, tender submitted by the contractor and the purchase order issued by the owner and other documents connected with the issue of the purchase order and orders, instruction, drawings, change orders, directions issued by the Owner/Engineer-in-Charge/Site-in-Charge for the execution, completion and commissioning of the works and the period of contract mentioned in the Contract including such periods of time extensions as may be granted by the owner at the request of the contractor and such period of time for which the work is continued by the contractor for purposes of completion of the work.

Signature and Seal of Bidder


Attachment 7

Page 2 of 20

Attachment to Enquiry no:9000033 - HB - 10135
2.7 "The Contractor" means the person or the persons, firm or Company whose tender has been accepted by the Owner and includes the Contractor's legal heirs, representative, successor(s) and permitted assignees.
2.8 The "Drawings" shall include maps, plans and tracings or prints thereof with any modifications approved in writing by the Engineer-in-Charge and such other drawings as may, from time to time, be furnished or approved in writing by the Engineer-in-Charge.
2.9 The "Engineer-in-Charge or Site-in-Charge" shall mean the person appointed or designated as such by the Owner and shall include those who are expressly authorised by the owner to act for and on its behalf.
2.10The Owner" means the HINDUSTAN PETROLEUM CORPORATION LIMITED incorporated in India having its registered office at PETROLEUM HOUSE, 17, JAMSHEDJI TATA ROAD, BOMBAY - 400020 and Marketing office at Mundra/Jaipur or their successors or assignees.
2.11 The "Permanent Work" means and includes works which form a part of the work to be handed over to the Owner by the Contractor on completion of the contract.
2.12 The "Project Manager" shall mean the Project Manager of HINDUSTAN PETROLEUM CORPORATION LIMITED, or any person so appointed, nominated or designated.
2.13 The "Site" means the land on which the work is to be executed or carried out and such other place(s) for purpose of performing the Contract.
2.14 The "Specifications" shall mean the various technical and other specifications attached and referred to in the tender documents. It shall also include the latest editions, including all addenda/corrigenda or relevant Indian Standard Specifications and Bureau Of Indian Standards.
2.15 The "Sub-Contractor" means any person or firm or Company (other than the Contractor) to whom any part of the work has been entrusted by the Contractor with the prior written consent of the Owner/Engineer-in-Charge/Site-in- Charge and their legal heirs, representatives, successors and permitted assignees of such person, firm or Company.
2.16 The "Temporary Work" means and includes all such works which are a part of the contract for execution of the permanent work but does not form part of the permanent work confirming to practices, procedures applicable rules and regulations relevant in that behalf.
2.17 The "Tender" means the document submitted by a person or authority for carrying out the work and the Tenderer means a person or authority who submits the tender offering to carry out the work as per the terms and conditions.
2.18 The "Work" shall mean the works to be executed in accordance with the Contract or part thereof as the case may be and shall include extra, additional, altered or substituted works as maybe required for the purposes of completion of the work contemplated under the Contract.
3. SUBMISSION OF TENDER
3.1 Before submitting the Tender, the Tenderer shall at their own cost and expenses visit the site, examine and satisfy as to the nature of the existing roads, means of communications, the character of the soil, state of land and of the excavations, the correct dimensions of the work facilities for procuring various construction and other material and their availability, and shall obtain information on all matters and conditions as they may feel necessary for the execution of the works as intended by the Owners and shall also satisfy of the availability of suitable water for construction of civil works and for drinking purpose and power required for fabrication work etc. Tenderer, whose tender may be accepted and with whom the Contract is entered into shall not be eligible and be able to make any claim on any of the said counts in what so ever manner for what so ever reasons at any point of time and such a claim shall not be raised as a dispute and shall not be arbitrable.
® A pre-bid meeting may be held as per the schedule mentioned in the tender.
3.2 The Tenderer shall be deemed to have satisfied fully before tendering as to the correctness and sufficiency of his tender for the works and of the rates and prices quoted in the schedule of quantities which rates and prices shall except as otherwise provided cover all his obligations under the contract.
3.3 It must be clearly understood that the whole of the conditions and specifications are intended to be strictly enforced and that no work will be considered as extra work and allowed and paid for unless they are clearly outside the scope, spirit, meaning of the Contract and intent of the Owner and have been so ordered in writing by Owner and/or Engineer-in-Charge/Site-in-Charge, whose decision shall be final and binding.


Signature and Seal of Bidder

Attachment 7

Page 3 of 20

Attachment to Enquiry no:9000033 - HB - 10135
3.4 Before filling the Tender the Contractor will check and satisfy all drawings and materials to be procured and the schedule of quantities by obtaining clarification from the Owner on all the items as may be desired by the Tenderer. No claim for any alleged loss or compensation will be entertained on this account, after submission of Tender by the Tenderer/Contractor and such a claim shall not be arbitrable.
®3.5 Unless specifically provided for in the tender documents or any Special Conditions, no escalation in the Tender rates or prices quoted will be permitted throughout the period of contract or the period of actual completion of the job whichever is later on account of any variation in prices of materials or cost of labour or due to any other reasons. Claims on account of escalation shall not be arbitrable.
3.6 The quantities indicated in the Tender are approximate. The approved schedule of rates of the contract will be applicable for variations upto plus or minus 25% of the contract value. No revision of schedule of rates will be permitted for such variations in the contract value, including variations of individual quantities, addition of new items, alterations, additions/deletions or substitutions of items, as mentioned above. Quantities etc. mentioned and accepted in the joint measurement sheets shall alone be final and binding on the parties.
3.7 Owner reserves their right to award the contract to any tenderer and their decision in this regard shall be final. They also reserve their right to reject any or all tenders received. No disputes could be raised by any tenderer(s) whose tender has been rejected.
3.8 The Rates quoted by the Tenderer shall include Costs and expenses on all counts viz. cost of materials, transportation of machine(s), tools, equipments, labour, power, Administration charges, price escalations, profits, etc. etc. except to the extent of the cost of material(s), if any, agreed to be supplied by Owner and mentioned specifically in that regard in condition of Contract, in which case, the cost of such material if taken for preparation of the Contractor's Bill(s) shall be deducted before making payment of the Bill(s) of the Contractor. The description given in the schedule of quantities shall unless otherwise stated be held to include wastage on materials, carriage and cartage, carrying in and return of empties, hoisting, setting, fitting and fixing in position and all other expenses necessary in and for the full and complete execution and completion of works and in accordance with good practice and recognised principles in that regard.
3.9 Employees of the State and Central Govt. and employees of the Public Sector Undertakings, including retired employees are covered under their respective service conditions/rules in regard to their submitting the tender. All such persons should ensure compliance to the respective/applicable conditions, rules etc. etc. Any person not complying with those rules etc. but submitting the tender in violation of such rules, after being so noticed shall be liable for the forfeiture of the Earnest Money Deposit made with the tender, termination of Contract and sufferance on account of forfeiture of Security Deposit and sufferance of damages arising as a result of termination of Contract.
® 3.10 In consideration for having a chance to be considered for entering into a contract with the Owner, the Tenderer agrees that the Tender submitted by him shall remain valid for the period prescribed in the tender conditions, from the date of opening of the tender. The Tenderer shall not be entitled during the said validity period, to revoke or cancel the tender without the consent in writing from the Owner.
In case the tenderer revokes or cancels the tender or varies any of terms of the tender without the Consent of the Owner, in writing, the Tenderer forfeits the right to the refund of the Earnest Money paid along with the tender.
®3.11The prices quoted by the Tenderer shall be firm during the validity period of the bid and Tenderer agrees to keep the bid alive and valid during the said period. The Tenderers shall particularly take note of this factor before submitting their tender(s).
3.12 The works shall be carried out strictly as per approved specifications. Deviations, if any, shall have to be authorised by the Engineer-in-Charge/Site-in-Charge in writing prior to implementing deviations. The price benefit, if any, arising out of the accepted deviation shall be passed on to the Owner. The decision of Engineer-in-Charge shall be final in this matter.
3.13 The contractor shall make all arrangements at his own cost to transport the required materials outside and inside the working places and leaving the premises in a neat and tidy condition after completion of the job to the satisfaction of Owner. All materials except those agreed to be supplied by the Owner shall be supplied by the contractor at his own cost and the rates quoted by the Contractor should be inclusive of all royalties, rents, taxes, duties, Octroi, statutory levies, if any, etc. etc.
3.14 The Contractor shall not carry on any work other than the work under this Contract within the Owner’s premises without prior permission in writing from the Engineer-in-Charge/Site-in-charge.
3.15 The Contractor shall be bound to follow and ensure compliance to all the safety and security regulations and other statutory rules applicable to the area. In the event of any damage or loss or sufference caused due to non-observance of such rules and regulations, the contractor shall be solely responsible for the same and shall keep the Owner indemnified against all such losses and claims arising from the same.

Signature and Seal of Bidder

Attachment 7

Page 4 of 20

Attachment to Enquiry no: 9000033- HB - 10135
3.16 At any time after acceptance of tender, the Owner reserves the right to add, amend or delete any work item, the bill of quantities at a later date or reduce the scope of work in the overall interest of the work by prior discussion and intimation to the Contractor. The decision of Owner, with reasons recorded therefore, shall be final and binding on both the Owner and the Contractor. The Contractor shall not have right to claim compensation or damage etc. in that regard. The Owner reserves the right to split the work under this contract between two or more contractors without assigning any reasons.
3.17 Contractor shall not be entitled to sublet, sub contract or assign, the work under this Contract without the prior consent of the Owner obtained in writing.
3.18 All signatures in tender document shall be dated as well as all the pages of all sections of the tender documents shall be initialled at the lower position and signed, wherever required in the tender papers by the Tenderer or by a person holding Power of Attorney authorising him to sign on behalf of the tenderer before submission of tender.
3.19 The tender should be quoted in English, both in figures as well as in words. The rates and amounts tendered by the Tenderer in the Schedule of rates for each item and in such a way that insertion is not possible. The total tendered amount should also be indicated both in figures and words with the signature of tenderer.
® If some discrepancies are found between the rates given in words and figures of the amount shown in the tender, the following procedure shall be applied :
(a) When there is a difference between the rates in figures and words, the rate which corresponds to the amount worked out by the tenderer shall be taken as correct.