International Supply Case Study bmw outline



Yüklə 13,49 Mb.
səhifə3/4
tarix29.11.2023
ölçüsü13,49 Mb.
#139848
1   2   3   4
BMWcase07 1

Savings through BTO

  • In the U.S.
      • Potential savings through BTO~ $1500/car*
      • Average incentives per car sold ~$1900 in 2002*
      • *Miemczyk and Holweg J. Bus. Logistics, 2004

Obstacles/ Requirements

  • Inability to supply customized vehicles within “acceptable” timeframes
    • Avg. Leadtime for customized vehicles: 6-10 weeks!!!
  • Short OTD
  • Process/Product/Volume flexibility
  • Flexibility from suppliers
  • Flexibility from logistics operators

Current BTO Levels

  • 1999: % BTO Avg. New Vehicle stock in days
  • U.S.: ~ 5% 60-90 days
  • U.K.: ~33% 64 days
  • Europe: ~48% 55 days
  • Japan (Toyota): ~60% 20 days
  • Source: Miemczyk and Holweg (2004)

BTO & BMW

  • BMW
  • BMW’s operations in SC Plant
  • BMW’s challenges in BTO
  • Available levers for control

BMW USA

  • www.bmwusafactory.com

BMW USA

  • Z4
  • X5

BMW

  • “Every customer receives his/her personalized vehicle at a compulsory date – at best at his/her preferred date”
  • Why offer flexibility?

Flexibility

  • 0
  • 10
  • 20
  • 30
  • -1,0
  • -0,5
  • 0,0
  • 0,5
  • 1,0
  • 1,5
  • 2,0
  • 2,5
  • days before order freeze
  • Xenon lights
  • Independent vehicle heater
  • Navigation systems
  • Equipment changes in % (accumulated)
  • %
  • Source: Goudiano CSCMP 2005

Yüklə 13,49 Mb.

Dostları ilə paylaş:
1   2   3   4




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©www.genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə