Access Road
Cut off Drain
Prevents upstream water flows
Contoured and roughed base surface
to prevent subsurface water flows and 
ensure stability
Slope 8%
1:7.7 vertical to horizontal
Clump Trees
Small contour channel to
collect sediment water
Winter Creek
Placed Overburden
Natural Base Surface
Indicative Completed Landform
Lot 3 South West Highway, Whitby
October 2012
Figure 17
SJS TRIM - IN12/17340
OCM122.9/01/13


 
 
 
 
 
 
 
 
Rehabilitation Management Plan 
&  
Visual Assessment 
 
 
  Rehabilitated Area (Planted 2005) – Lot 901 South Western Highway 
 
Proposed Landform Raising 
Whitby Quarry 
Lot 901 South Western Highway, Whitby 
 
 
Ransberg Pty Ltd T/A WA Bluemetal 
41 Spearwood Ave, Bibra Lake WA 6163 
PO Box 1404 Bibra Lake WA 6595 
 
 
 
 
 
 
 
 
 
 
 
10 October 2012
 
WA  BLUEMETAL 
 
 
SJS TRIM - IN12/17340
OCM122.9/01/13


Visual Assessment & Rehabilitation Management Plan 
Proposed Landform Raising – Lot 901 South Western Highway, Whitby 
10 October 2012 
 
WA Limestone 
 
Page 2 
 
Contents 
1.0 
Background ................................................................................................................................. 3 
2.0 
Site Description and Landform ................................................................................................... 3 
3.0 
Geology, Soils and Earthworks .................................................................................................... 4 
3.1 
Rehabilitation .............................................................................................................................. 5 
3.2 
Vegetation Condition .............................................................................................................. 5 
3.3 
Rehabilitation & Revegetation Management ......................................................................... 5 
3.4 
Local species proposed to be used in rehabilitation............................................................... 6 
3.5 
Fauna Management ................................................................................................................ 7 
3.6 
Weed Management ................................................................................................................ 7 
3.6.1 
Weed Management Principles ........................................................................................ 7 
3.7 
Fire breaks ............................................................................................................................... 7 
3.8 
Dieback Management ............................................................................................................. 8 
3.8.1 
Dieback Management Principles..................................................................................... 8 
4.0 
Visual Management .................................................................................................................. 13 
4.1 
Potential Impact .................................................................................................................... 13 
4.1.1 
Landscape value ............................................................................................................ 13 
4.1.2 
Visual landscape character ........................................................................................... 13 
4.1.3 
Context in the landscape .............................................................................................. 14 
4.2 
Assessment Methodology ..................................................................................................... 14 
4.3 
Assessment ........................................................................................................................... 15 
4.3.1 
Foreground zone ........................................................................................................... 15 
4.3.2 
Middle ground zone ...................................................................................................... 15 
4.3.3 
Background zone ........................................................................................................... 16 
4.4 
Findings ................................................................................................................................. 16 
4.5 
Proposed Visual Management .............................................................................................. 16 
 
 
Figures 
 
Figure 1: Existing Landform .................................................................................................................. 9 
Figure 2: Indicative Stage 1 ................................................................................................................. 10 
Figure 3: Indicative Stage 2 ................................................................................................................. 11 
Figure 4: Indicative Completed Landform ........................................................................................... 12 
Figure 5: Viewshed Analysis ................................................................................................................ 17 
Figure 6: Viewshed Analysis ................................................................................................................ 18 
Figure 7: Elevations ............................................................................................................................. 19 
 
 
Appendices 
 

Site Photographs 

Site & Design Plans 
 
 
SJS TRIM - IN12/17340
OCM122.9/01/13


Yüklə 20,11 Mb.

Dostları ilə paylaş:
1   2   3   4   5   6   7   8   9




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©www.genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə