CSC is conducted in price zones without separation of free power transfer zones (FTZ). Indexing is
made when the CSC was carried out for more than 1 year in advance. The price of CSC indexed for the period
from January 1 of the year following the year of the CSC, until January 1 of the year of delivery, in accordance
with the CPI, decreased by 1%.
In the long term capacity market demand volume in the competitive selection of power given the
dependence of the volume of demand on the price of power: at a lower price buyers are willing to purchase a
larger amount of power at a higher price - lower. Graph of the demand function is a straight
line segment passing
through two points, the values of which are set separately for each price zone, and for each CSC. The first point
of the volume of demand is determined by the procedure of the Ministry of Energy on the basis of the forecast
peak demand in the price zone and the planned reserve ratio, the price is set at 150 thousand rubles / MWh for
the CSC 2016 for the first price zone and 210 rubles / MW for the second price zone. In the second point of the
demand volume increased by 12% relative to the value at the first point, the price for the CSC 2016 is set at 110
thousand rubles / MWh for the first price zone and 150 rubles / MW for the second price zone.
The price of CSC corresponds to a maximum of prices in selected applications and the price at which
the demand function takes a value equal to the total volume of the selected power (including power, paid
regardless of the results of CSC). The CSC price for each zone is the same for all the selected generating
facilities. The power which has not passed the competitive selection is not paid.
As we approach the year of delivery in case of exceeding the adjusted demand for power over the
amount payable generating capacity possible corrective competitive capacity selection. A mandatory fee that
does not depend on the results of CSC, subject to the power introduced by PDM and PDM similar agreements
with new nuclear power plants and hydropower plants, as well as generating units, whose work is essential for
maintaining the technological modes of operation of the power or thermal energy supply (forced generators).
Payment for power delivered by internally generators, carried out at the price established by the
authorized federal agency (or the Government of the Russian Federation) is not higher than the power price in
the previous year, the sale as a result of competitive selection of power or forced mode. The decision to classify
the generator to internally accepted prior to the CSC. As an exception can only be the generating facilities for
which after the CSC has been stated about the intention of decommissioning, while the Ministry of Energy was
demanded the postponement of the output due to the threat of attack power deficit. Power generators operating in
forced mode, and power introduced by the Democratic Party and similar contracts with new nuclear power plants
and hydropower plants, during the CSC is included in the spot price acceptance of the offer.
Payment capacity is distributed as follows: the financial burden to pay for power generating facilities
selected CSC and power facilities, receiving payment on the PDM is distributed to all users of the price zone.
Power objects related to forced generators to the threat of attack power shortage is paid by consumers the
corresponding WSP. Power objects related to forced generators to the threat of attack heat deficit are paid by
consumers of the corresponding subject of the Russian Federation.
On April 28, 2014, Regulation of the Government of the Russian Federation No. 374 On Amendment
of Regulations for Wholesale Electricity and Capacity Market with Regard to Characteristics of
Participation in the Wholesale Market of Electric Power Engineering Entities Owning Hydropower
Plants Located in the Second Pricing Zone of the Wholesale Market was signed, concerning partial
deregulation of the capacity market in Siberia.
This Regulation stipulates amendments to the Regulations for the Wholesale Electricity and Capacity
Market:
From May 1, 2014 till December 31, 2015, the capacity of hydropower plants, located in the second
pricing zone of the wholesale market, is sold on the basis of competitive capacity outtake (CCO) at the price of
capacity sale under regulated contracts amounting to 35 per cent of capacity volume being sold according to the
CCO results; from January 1, 2016 till December 31, 2016—20 per cent. The remaining capacity volume of
hydropower plants being sold according to the CCO results in the second pricing zone will be paid at the prices
determined according to the CCO results at the relevant free power transfer zones;
The rule on application of prices equal to the prices stated in the regulated contracts for calculation of
capacity cost according to the CCO results is not applied to new hydropower plants (generating facilities of
hydropower plants in relation to generation DPCs of which electricity and capacity was not traded as at January
1, 2012).
Day-Ahead Market (DAM):
The volume of electricity generated above the RD volumes is sold at free prices on the day-ahead market
and shortages are purchased on the DAM so as to provide for RC. The rules of the wholesale market provide for
47
the possibility of electricity sale/purchase under free bilateral contracts (FBC). Participants in the wholesale
market independently determine counteragents under contracts, as well as prices and volumes of deliveries
within free bilateral contracts.
Balancing Market (BM):
Deviations of the actual electricity production volume from the planned production volume are traded on
the balancing market at prices formed on the basis of competitive selection of price bids of participants.
The Issuer sells a share of electricity produced on the wholesale market at free prices.
Factors that may have a negative impact on sale of the Issuer's products (works, services):
Change in the regulatory and legal framework in the electric power industry associated with liberalization
of the electricity and capacity market.
The Issuer's measures on minimization of negative factors:
Formation of a regulatory and legal framework favourable to the Issuer for electricity and capacity market
performance. For the purposes thereof the Issuer is fully engaged in processes pertaining to development of laws
and regulations in the electric power industry performed by the Ministry of Energy of the Russian Federation,
NP Market Council Association and FAS of the Russian Federation.
3.2.5. Information on the Issuer's Authorizations (Licenses) or Permits for
Separate Types of Works
Authority (organisation) issuing the relevant authorization (license) or permit for separate types of works:
Federal Service for Environmental, Engineering, and Nuclear Supervision
Number of authorization (license) or document evidencing the receipt of permit for separate types of
works:
VKH-00-015161
Type of activity (work), in relation to which the Issuer has received the relevant authorization (license) or
permit:
Operation of explosion/fire hazardous and chemically hazardous production facilities of I, II and
III hazard classes
Issue date of the authorization (license) or permit for separate types of works:
December 16, 2014
Validity period of the authorization (license) or permit for separate types of works:
Unlimited
Authority (organisation) issuing the relevant authorization (license) or permit for separate types of works:
Self-Regulating Organisation Non-Commercial Partnership EnergoStroiAllianz Group of Construction
Organisations
Number of authorization (license) or document evidencing the receipt of permit for separate types of
works:
No. С-089-
05-02610
Type of activity (work), in relation to which the Issuer has received the relevant authorization (license) or
permit:
Certificate of permit for separate type or types of work having influence on the safety of capital
construction projects
Issue date of the authorization (license) or permit for separate types of works:
August 14, 2015
Validity period of the authorization (license) or permit for separate types of works:
Unlimited
Authority (organisation) issuing the relevant authorization (license) or permit for separate types of works:
Yenisey Administration of the Federal Service for Environmental, Engineering, and Nuclear Supervision
Number of authorization (license) or document evidencing the receipt of permit for separate types of
works:
No. А66-02932
Type of activity (work), in relation to which the Issuer has received the relevant authorization (license) or
permit:
Certificate of Registration of Hazardous Industrial Facilities
Issue date of the authorization (license) or permit for separate types of works:
October 08, 2014
Validity period of the authorization (license) or permit for separate types of works:
Unlimited
Authority (organisation) issuing the relevant authorization (license) or permit for separate types of works:
Centre for Licensing, Certification, and Protection of State Secrets of the FSS of Russia
Number of authorization (license) or document evidencing the receipt of permit for separate types of
works:
GT No. 0085520 Reg. No. 5269
Type of activity (work), in relation to which the Issuer has received the relevant authorization (license) or
permit:
Works involving use of information classified as state secret
Issue date of the authorization (license) or permit for separate types of works:
August 10, 2015