Draft operational guidelines of digital india land records modernization programme (dilrmp) introduction



Yüklə 3,17 Mb.
səhifə92/92
tarix19.06.2023
ölçüsü3,17 Mb.
#117879
1   ...   84   85   86   87   88   89   90   91   92
Final Draft Revised Guideline of DILRMP with manual

Connectivity Details

2

Details of Last Mile connectivity arranged (Tick out of following)

Broadband







Broadband with VPN







Leased Line







SWAN -POP







Other







Not yet arranged







3

Whether SRO and Tehsil have been integrated










If Not, progress so far











E. Survey and Settlement using modern technology
Total area of districts in SQ KM:
Choice of Technology

Technology being used (Tick)

Area being surveyed in SQ KM

  1. Aerial Photography +GPS/ETS




  1. GPS+ETS (Ground Methods)




  1. HSRI+GPS+ETS




  1. Any other...LIDAR/ALTM etc





F. Modern Land Records Management Centre under NLRMP at Tehsil/Taluk Level
Name of Tehsil /Taluk:

1

Whether Record Room co-located with tehsil computer Centre

Y/N

2

Physical Storage

Physical storage through compactors Y/N

No of compactor installed :

Whether stored file(Paper) indexed and referenced through computerised system

3

Operational Area

No of Server installed :

No of Clients installed:

Whether Storage Area Network (SAN) required: Y/N

Whether archival records scanned and stored digitally : Y/N

If yes, stored in CD/DVD/TAPE/HDD/SAN (Tick)

4

Public Services

Whether scanned records are distributed

5

Reception and Waiting facility exist

Y/N



3. Financial Performance/ Position (Quarterly Reporting) - District Wise


Sr. No

Broad Activities

Opening Balance as on 1st April of the year

Funding Received during the years (in Lakhs)

Total Amount Available
(in Lakhs)

Amount Utilized
(In Lakhs)

Central Share

State Share

Total

1

Computerization of Land Records (100% Central Funding)



















2

Survey/resurvey and updating of survey & settlement records (50% Central Funding)



















3

Computerization of registration (25% Central Funding)



















4

Modern record rooms/land records management centres at Tehsil (50% Central Funding)



















5

Training and capacity Building




















GLOSSORY



ADM

Additional District Magistrate


ASA

Audited Statement of Accord


ATI

Administrative Training Institutes


CDAC

Centre for Development of Advanced Computing


C-DAC

Centre for Development of Advanced Computing


CEO

Chief Executive Officer


CERT

Computer Emergency Response Team


CLR

Computerization of Land Records


CRO

Circle Revenue Officer


DEM

Digital Elevation Model


DGPS

Differential Global Positioning System


DILRMP

Digital India Land Records Modernization Programme


DMS

Data Model Structure


DoLR

Department of Land Resources


DPI

Dots Per Inch


DPR

Detailed project Reports


DPS

Digital Photogrammetric Station


DRO

District Revenue Officer


DTDB

Digital Topographic Data Base


EO

Executive Officer


ETS

Electronic Total Station


FMB

Field Measurement Books


FSI

Forest Survey of India


GCP

Geo-referenced Control Point


GCPL

Ground Control Point Library


GDOP

geometric dilution of precision


GIS

Geospatial Information System


HRSI

High Resolution Satellite Imagery


IEC

Information, Education and Communication


IGS

International Geodetic Survey


ISMS

Information Security Management System


ISRO

Indian Space Research Organization


JL

Jurisdiction List


LAN

Local Area Network


LBSNAA

Lal Bahadur Shastri National Academy of Administration


LISS

Linear Imaging Self-Scanner


LPMs

Land Parcel Maps


LRD

Land Revenue Department


MoU

Memorandum of Understanding


NGO

Non-Governmental Organisation


NIC

National Informatics Centre


NIRD

National Institute of Rural Development


NLRMP

National Land Records Modernization Programme


NNRMS

National Natural Resource Management System


NRSC

National Remote Sensing Centre


NSDB

National Spatial Data Base


NSDI

National Spatial Data Infrastructure


O&M

Operational and Maintenance


OSS

Open Source Software


PMU

Programme Management Unit


PoP

Point of Presence


RDBMS

Relational Database management Systems


RMS

Root Mean Square


RoR

Record of Rights


RPN

Rendered Plot Numbers


SAN

Storage Area Network


SDM

Sub-Divisional Magistrate


SDO

Sub-Divisional Officer


SLDC

State Level Data Centres


SLUSI

Soil & Land Use Survey of India


SOI

Survey of India


SRA&ULR

Strengthening of Revenue Administration and Updating of Land Records


SROs

Sub-Registrar‘s Offices


SWAN

State Wide Area Network


TS

Total Stations


UT

Union Territory


UTF

Unicode transformation format


UTM

Universal Traverse Mercator


VPN

Virtual Private Network


WAN

Wide Area Network


WGS

World Geodetic System

**************




Yüklə 3,17 Mb.

Dostları ilə paylaş:
1   ...   84   85   86   87   88   89   90   91   92




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©www.genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə