26 
 
Remarking  nine  modernized  hydraulic  units  of  Kama,  Saratov,  Zhiguli,  the  Volga  and  the  Novosibirsk  HPP 
allowed  increasing  of  their  capacity  to  55.5  MW.  Modernization  of  the  equipment  is  accompanied  by 
improvement  of  operational  and  environmental  performance.  The  new  turbines  and  generators,  designed  and 
manufactured in accordance with the current level of power engineering, have a higher efficiency, longer run and 
require lower repair costs, more reliable and secure.. 
•  Modern diagnostics methods without equipment shutdown are implemented. 
•  The structure and volumes of spare parts optimized. 
•  A tender selection of service and supply organisations is performed to improve the quality of services 
and materials provided, increase contractors’ responsibility, and reduce the cost per unit. 
To  ensure  reliability  of  the  system,  emergency  automation  is  implemented  and  constantly  updated  in 
accordance with the latest requirements. The objectives of the centralized emergency automation system include 
provision  of  system  reliability  in  the  event  of  local  emergencies.  As  a  result  of  the  application  of  the  above 
activities, it is worth noting that the Sayano-Shushenskaya HPP of RusHydro on the results of 2015was awarded 
as  the  System  Operator  "For significant  contribution  to  the  reliability  modes  UES  of  Russia".  The  award  took 
place on December, 22 at a gala event of the Ministry of Energy of the Russian Federation in honour of the Day 
of Energy. 
Risk  management  within  compliance  with  the  industrial  safety  requirements  throughout  the  production 
risk  management  structure  of  PJSC  “RusHydro”  branches  is  ensured  on  the  basis  of  an  effective  system  of 
production  control  over  compliance  with  the  requirements  of  industrial  safety  at  PJSC  “RusHydro”  branches, 
developed on the basis of industrial safety requirements of the federal legislation. 
2. Environmental risks expressed in the form of oil leakage to rivers from the hydroelectric generating set 
of HPPs and the exceeding of dam (storage reservoir) benchmarks in the upstream and downstream pools. 
Fines  for  possible  oil  leakages  will  not  affect  the  creditworthiness  of  the  Issuer,  so  this  risk  may  be 
considered  to  be  insignificant.  Furthermore,  during  implementation  of  actions  stipulated  by  the  prospective 
technical  reconstruction  and  modernization  program,  the  Issuer  replaces  the  elements  and  units  of  the 
hydroturbines with modern facilities, the design of which ensures high ecological compatibility of the production 
process.  An  example  was  introduced  in  September  2015  for  use  on  the  Cheboksary  GES  "RusHydro"  of 
reconstructed  hydraulic  unit  (GA)  number  2.  Water  turbines  of  Cheboksary  GES  are  environmentally  friendly 
designed  with  oil-free  bushings  impellers.  This  prevents  even  the  hypothetical  possibility  of  oil  entering  the 
water. 
The rising of the storage reservoir level in the upper or lower benchmarks could result in the flooding of 
coastal areas where the production/residential facilities and natural complexes are located. 
Action plan for management of these risks: 
The  storage  reservoir  level  control  is  carried  out  in  strict  compliance  with  the  schedule  issued  by  the 
Inter-Agency Operational Team. To prevent underflooding, protective dams and installations are used. It is the 
owners’  responsibility  to  ensure  their  proper  condition  and  timely  fortification  of  disintegrating  dam  sections. 
The Issuer shall for its part timely inform water consumers based on meteorological forecasts for the period of 
flood inflows on possible river levels to allow them to adopt the necessary protection measures. 
 
To improve the environmental protection management process further, PJSC “RusHydro” implements an 
environmental  management  system  in  accordance  with  the  international  standard  ISO-14001:2004.  On 
November  2015  PJSC  "RusHydro"  was  the  winner  of  the  First  All-Russian  competition  "MediaTEK"  in  the 
category  "Environmental  standard."  Diploma  of  the  winner  in  the  category  "Environmental  standards"  was 
presented  on  November  20  in  the  framework  of  the  business  program  of  the  IV  International  Forum  ENES  - 
2015. 
Environmental audits of company subsidiaries are performed on a regular basis. Recommendations issued 
based on the results of environmental audit are implemented in accordance with the Inconsistencies Elimination 
Action Plan. 
In September 2015 PJSC "RusHydro" took 3rd place in the competition of "Environmental Initiative of 
Russian companies in the media. Mining and metallurgy" prepared by “the Institute of Modern Media” (Modern 
Media Research Institute) in collaboration with the TV channel "Living Planet". Federal charity event "Protect!" 
is  held  since  2005  by  all  hydropower  plants  of  the  location  areas  from  the  Caucasus  to  the  Far  East.  The 
campaign aims to raise young people caring attitude to water reservoirs and coastal areas. This result is exported 
tons  of  debris,  landscaping  of  beaches  and  promenades  with  the  participation  of  more  than  30  000  children, 
adolescents  and  adults.  In  2015,  51  environmental  actions  took  place  in  17  regions  of  Russia,  as  well  as  in 
Kyrgyzstan. More than 4,000 participants have gathered about 6,000 bags of garbage. 
3. Risks related to construction of alternative power supply facilities by large consumers. 
One  of  the  objectives  of  the  reformation  of  the  Russian  power  industry  is  to  create  competition  within 
Russian power generation and power supply sectors. Construction of alternative power supply facilities by large 
consumers may result in competitive expansion and reduction of the Issuer’s future power production and sales 


Yüklə 5,37 Mb.

Dostları ilə paylaş:
1   ...   9   10   11   12   13   14   15   16   ...   148




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©www.genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə