Proposal for Northern Extension of Northolt Tunnel sift report



Yüklə 0,76 Mb.
Pdf görüntüsü
səhifə1/27
tarix18.05.2018
ölçüsü0,76 Mb.
#44521
  1   2   3   4   5   6   7   8   9   ...   27


`Code 

1 - 


Accepted

 

C222-ATK-DS-REP-020-000034 |P06 | 27 Feb 2015 



 

 

Proposal for Northern Extension of Northolt

 

Tunnel  



SIFT Report 

 

  



Revision 

Date 

Issued for/Revision details 

Revised by 

P01 


13.06.2014 

Issued for review 

HSF 

P02 


30.01.2015 

Review and update to include 

HS2 comments 

SS 


P03 

24.02.2015 

Updated to include comments 

and Rail Systems info 

AR 

P04 


26.02.2015 

Updated following review 

AR 

P05 


27.02.2015 

Updated for final review 

AR 

P06 


02.03.2015 

Final 


AR 

 

Name 



Data 

FOI / EIR 

None 

Document type 



Report 

Directorate 

London West Midlands 

WBS 


B320 & PE.06.57 

Keywords 

Colne Valley Viaduct, Northolt Tunnel, River Colne 

Authors 


H S Farrant 

Checker 


Roger Weber 

Approver 

Andy Robson 

Owner 


C222 Atkins 

Review Directorate 

LWM TD 

Employer’s Lead Reviewer 



Neil Cowie 

Authorised for use 

 

 



`Code 

1 - 


Accepted

Uncontrolled when printed 

INTERNAL INFORMATION

 

Northern Extension of Northolt Tunnel SIFT Report 



 

Northern Extension of Northolt Tunnel SIFT 

Report C222-ATK-DS-REP-020-000034 

Revision – P06 

 

                      2 



Uncontrolled when printed 

 

INTERNAL INFORMATION 



 

London West Midlands 

Northolt Tunnel Extension - SIFT Report

 

Contents 



Page number 

1.

 

Executive Summary ................................................................................................... 5

 

2.

 

Introduction ............................................................................................................... 6

 

3.

 

Scope of the Sift ......................................................................................................... 8

 

4.

 

Assumptions .............................................................................................................. 9

 

4.1


 

General .................................................................................................................. 9

 

4.2


 

Applicable Safety Standards ............................................................................... 10

 

5.

 

Constraints and Issues ............................................................................................. 12

 

5.1


 

Study Area ........................................................................................................... 12

 

5.2


 

Site Constraints ................................................................................................... 12

 

5.3


 

Environmental Constraints ................................................................................. 13

 

5.4


 

Land and Property Constraints ........................................................................... 13

 

5.5 


Engineering Construction .................................................................................... 13

 

5.6



 

Rail Systems Construction ................................................................................... 14

 

6.

 

Option Description ................................................................................................... 15

 

6.1


 

General ................................................................................................................ 15

 

6.2


 

Intervention Gap Development .......................................................................... 15

 

6.3 


 

Provision for Heathrow Spurs - General ............................................................. 17

 

6.4


 

Development of Railhead Location - General ..................................................... 19

 

6.5


 

Development of Intervention Shaft Locations - General .................................... 21

 

6.6


 

Impact on Rail Systems ....................................................................................... 25

 

6.7


 

Northolt Tunnel Construction and Logistics - General ....................................... 30

 

6.8


 

Impact on Northolt Tunnel Construction - General ............................................ 32

 

6.9


 

Option A (Proposed Scheme) – Hybrid Bill ......................................................... 33

 

6.10


 

Option B – Tunnelled Option with Passive Heathrow Spur Provision ................ 34

 

6.11


 

Option C – Tunnelled Option without Passive Heathrow Spur Provision ........... 35

 

7.

 

Comparison of Options ............................................................................................ 36

 

7.1


 

Construction Costs .............................................................................................. 36

 

7.2


 

Programme Impacts ............................................................................................ 37

 



Yüklə 0,76 Mb.

Dostları ilə paylaş:
  1   2   3   4   5   6   7   8   9   ...   27




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©www.genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə